Created with Pixso. Home Created with Pixso. About Us Created with Pixso. Factory Tour

Factory Tour

Production Line


We work with certified manufacturing partners across Guangdong, each operating dedicated production lines for portable power stations.


 🏭 Assembly Lines

  SMT + semi-automated final assembly. 

  Monthly capacity: 50,000+ units  across all partner facilities.

🔋 Battery Pack Assembly

 Cell matching, BMS integration, and pack assembly with automated
 welding and testing at partner facilities.


📦 Aging & Testing

 100% of units undergo full-load aging, charge/discharge cycling, and safety testing before packaging.


 Quality Control
• Incoming material inspection (IQC)
• In-process quality control (IPQC)
• Final quality inspection (FQC)
• 100% aging test before shipping
• Drop test, vibration test, high/low temperature test


Our team is on-site throughout production, monitoring progress and conducting inspections to ensure every order meets spec.

company.img.alt
company.img.alt
company.img.alt
company.img.alt
company.img.alt
company.img.alt
OEM/ODM

OEM / ODM Customization

We make your brand our priority. Every product ships with your logo, your packaging, and your specifications — never ours.


🔧 Customization Options

  • Logo printing (silk screen / laser engrave / UV print)
  • Custom housing colors and surface finishes
  • Output spec adjustments (wattage, port configuration)
  • Retail packaging design — color box, insert, manual
  • Accessory bundles (cables, solar panels, carrying cases)


📋 How We Work Together
Step 1: Inquiry & Requirements
Share your requirements — power, capacity, features, quantity, target price. We reply with an initial quote and feasibility assessment.


Step 2: Sample Development
OEM: We modify existing models with your logo and packaging
ODM: We develop new products based on your specifications
Sample delivery: 7–15 days (full custom ODM timelines quoted on request)


Step 3: Certification (If Needed)
All certifications (CE, FCC, PSE, RoHS, UN38.3, MSDS) transfer to your branded products. We can also help you apply for brand-specific certification on request:
CE/FCC: 2–4 weeks
UL: 2–6 months
UN38.3/MSDS: 1–2 weeks


Step 4: Mass Production
Production lead time: 15–20 days
100% QC inspection before shipping
Shipping arranged by sea, air, or express


Step 5: After-Sales Support
2-year warranty
Technical support
Replacement parts available


📐 MOQ
From 200 units for logo/color customization. Full custom ODM projects quoted based on specification.


R&D

Product development is handled through our manufacturing partners' in-house engineering teams, with our team coordinating directly between you and the engineers.


🔬 What We Support
   • New product development from concept to mass production
   • Existing product modifications — capacity, output, port layout
   • BMS and firmware customization
   • Industrial design and structural engineering
   • Certification testing and compliance engineering


🧪 Testing Equipment
   High-low temperature chambers, vibration test benches, salt-spray test chambers, battery cycle testers, EMC/ESD test equipment — available through partner facilities.


📅 Development Timeline
   Modified standard products: 30–45 days to first sample.
   Full custom ODM: 60–90 days depending on complexity.


We translate your market requirements into engineering specifications, manage prototyping and testing, and see the product through to mass production — keeping you informed at every stage.

Contact Us